Weatherford Introduces Velox™ Wellhead System

June 5, 2020 | Oil & Gas | Energy Facts Staff Writer | 2min

Weatherford International plc announced the Velox™ wellhead system, a best-in-industry solution for operators needing to lock in pressure integrity while enhancing safety and improving efficiency. Velox delivers unmatched isolation between casing strings with quick-connect components that maintain pressure control, reduce potential leak paths, and minimize non-productive time during installation in many applications, including high-pressure, high-temperature, and sour-gas wells.

The Velox system expedites installation by enabling the packoff to be run in a single trip from the rig floor, which removes personnel from the cellar. The system also reduces potential leak paths by eliminating conventional flange-to-flange methods and external lockdown screws.